Construction Of Line And Dtr Structure For Shifting Of Line And Releasing Of New Connection And Other Work Under Deposit Head Under Edd Upcl Khatima.-2 Cartage of PCC pole from store center UPCL Sitarganj or other dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 3 Cartage of ST Pole SP-33/45/55 from store center UPCL Sitarganj or other to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 4 Cartage of ST Pole SP-72 from store center UPCL Sitarganj to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 5 Cartage of 16/25 KVA DTR from store center UPCL Sitarganj or other to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 6 Cartage of 63 KVA DTR from store center UPCL Sitarganj or other to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 7 Cartage of 100 KVA DTR from store center UPCL Sitarganj or other to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 8 Cartage of 160/250 KVA DTR from store center UPCL Sitarganj or other to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 9 Cartage of 400/500 KVA DTR from store center UPCL Sitarganj or other to dump store / work site approximate Distance 35 Km to 70 Km including loading and unloading into truck and unloading at work site / Dump Store. 10 Erection of PCC Pole sigle support pole in proper level and alignmentalongwith fixing of all accessories, like top channel & Clamps as per RESSPO construction manual. 11 Erection of PCC Pole Double Pole Structure in proper level and alignmentalongwith fixing of all accessories, like top channel & Clamps as per RESSPO construction manual. 12 Erection of Steel Pole SP-33/45/55 sigle support pole in proper level and alignmentalongwith fixing of all accessories, like top channel & Clamps as per RESSPO construction manual. 13 Erection of Steel Pole SP-33/45/55Pole Double Pole Structure in proper level and alignmentalongwith fixing of all accessories, like top channel & Clamps as per RESSPO construction manual. 14 Erection of Steel Pole SP-72 sigle support pole in proper level and alignmentalongwith fixing of all accessories, like top channel & Clamps as per RESSPO construction manual. 15 Erection of Steel Pole SP-72 Pole Double Pole Structure in proper level and alignmentalongwith fixing of all accessories, like top channel & Clamps as per RESSPO construction manual. 16 Excavatin of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work 17 Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size: 8 coars sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction manual. 18 Muffing of pole size 0.45 M x 0.60 m radious with CC 1:3:6 (1 cement:3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, store and sand etc. 19 Fabrication of MS channel angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESSPO sehedule and local approved drawing. 20 Installation of Stay at 11 KV Line/Pole - Fixing, tightening and nozzalling of stay with pole and stay rod with Excavation,Grouting of stay in size 0.6x0.6x0.3 in CC ration 1:4:8 (1 Cement:4graded stone 20mm nominal size : 8 Coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO maunal. 21 Installation of Stay at LT Line/Pole - Fixing, tightening and nozzalling of stay with pole and stay rod with Excavation,Grouting of stay in size 0.6x0.6x0.3 in CC ration 1:4:8 (1 Cement:4graded stone 20mm nominal size : 8 Coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO maunal. 22 Earthing of support with MS earth rod of 2.5 meter long by hammaring of MS Rod to proper depth and connecting the earth electrode with the help of G.I. Wire as per RESSPO Manual. 23 Chemical Earthing :Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150mm. Placing of earthing electrode (to be supplied by contractor as per drqwing No. A) as drawing B, connecting the same with G.I. Strip ) to be supplied by contractor) of size 35x6mm as per drawing C for a miniumu lenght 6M treatment of soil with hightly condctive substance as per IS30343 complete in all respect, result of earthing resistance to be recorded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. 24 Guarding of line over (Telephone / Road / LT line crossing as per drawing with 6/8 SWG G.I. Wire including fixing of guarding channel / Angle as per RESSPO manual. LT / 11 KV. 25 Painting of Steel Pole SP-33/45/55 poles with angle and channel and all steel part by one coat of Red Oxide primer and two coats of aluminium paint and two strip of fluorascent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. 26 Painting of Steel Pole SP-72 poles with angle and channel and all steel part by one coat of Red Oxide primer and two coats of aluminium paint and two strip of fluorascent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. 27 Laying of LT service cable from pole to consumer end meter alongwith supporting GI wire. 28 Providing and fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6mm and Nuts & bots, dange r boards of MS Sheet 2mm Thick 11x7 size (Insluding cost of all material) 29 Making of section pole for existing HT line complete in all respect. 30 Laying, sagging & binding of AB Cable of size 120 Sq.mm. these rates are only for cable additional provision to be made for matching accessories installation, case of any network modification ie.,additional pole etc. and for actual connection disconnection as per site condition. 31 Laying, Spreading, Stringing and sagging of LT weasel lines 01 Phase 02 Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPO. 32 Laying, Spreading, Stringing and sagging of LT Weasel lines 02 Phase 03 wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPO. 33 Laying, Spreading, Stringing and sagging of LT Weasel lines 03 Phase 04 Wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPO. 34 Laying, spreading, stringing and sagging of 11KV line in 3 phase (3 Phase 4 wire) in weasel as phase wire with G.I. Earth wire complete including fixing of all accessories in 3 Nos. Conductor in parallel with binding and jumpering as per profile and sagging chart. 35 Installation / mounting of 25 KVA DTR on pole structure and fixing of channel / angle etc. and making alll connections of HT and LT side and its complete commissioning. 36 Installation / mounting of 63 KVA DTR on pole structure and fixing of channel / angle etc. and making alll connections of HT and LT side and its complete commissioning. 37 Installation / mounting of 100 KVA DTR on pole structure and fixing of channel / angle etc. and making alll connections of HT and LT side and its complete commissioning. 38 Installation / mounting of 250/160 KVA DTR on pole structure and fixing of channel / angle etc. and making alll connections of HT and LT side and its complete commissioning. 39 Installation / mounting of 400/500 KVA DTR on pole structure and fixing of channel / angle etc. and making alll connections of HT and LT side and its complete commissioning. 40 Dismentling of 16/25 KVA DTR from double pole structure / line complete as per RESSPO specification and as per direction of Engineer-in-charge. 41 Dismentling of 63/100 KVA DTR from double pole structure / line complete as per RESSPO specification and as per direction of Engineer-in-charge. 42 Dismentling of 160/250 KVA DTR from double pole structure / line complete as per RESSPO specification and as per direction of Engineer-in-charge. 43 Dismentling of 400/500 KVA DTR from double pole structure / line complete as per RESSPO specification and as per direction of Engineer-in-charge. 44 Dismentling of old line and rolling of conductor, pole structure and other complete work as per site requirement. 45 Back Cartage of received back old line material from work site to JE Store/ UPCL store inculding loading & unloading (0 to 25 Km distance). 46 Back Cartage of damage DTR capacity 16/25/63/100/250/400/500 from work site to UPCL store distance 01 to 70 Km including loading and unloading by contractors own vehicle. 47 Following material supply as per UPCL Norms - 48 Supply of LT Shackle Insulator of size 75x90 mm as per RESPO 49 Supply of LT Clamps made of best quality M.S. Strip of size 50x6mm duly painted by red oxide primer with Nut & Bolt of size 65x16mm complete as per RESPO. 50 Supply of Stay Insulator of size 100 x 115 mm as per RESPO. 51 Supply of Stay Set Clamps made of best quality M.S. Strip of size 50x6mm duly painted by red oxide primer with Nut & Bolt of size 65x16mm complete as per RESPO. 52 Supply of X Arm Holding Clamp made of best quality M.S. Strip of size 50x6mm duly painted by red oxide primer with Nut & Bolt of size 65x16mm complete as per RESPO. 53 Supply of Holding clamp for top & Dropper channel made of best quality M.S. Strip of size 50x6mm duly painted by red oxide primer with Nut & Bolt of size 65x16mm complete as per RESPO. 54 Supply of F Clamp made of best quality M.S. Strip of size 50x6mm duly painted by red oxide primer with Nut & Bolt of size 65x16mm complete as per RESPO. 55 Supply of Earth Clampsmade of best quality M.S. Strip of size 50x6mm duly painted by red oxide primer with Nut & Bolt of size 65x16mm complete as per RESPO. 56 Supply of Nut & Bolt for shackle Insulator as per RESPO. 57 Supply of Aluminium lugs of size 50 sqmm as per RESPO. 58 Supply of Aluminium lugs of size 95 sqmm as per RESPO. 59 Supply of Aluminium lugs of size 120 sqmm as per RESPO.
|