Drainage Canal Construction Work – Development Of The Wäldchenloch Development Area - Road Construction Work And Canal Construction Work. Main Masses: Sewer Construction Work Section: - Rainwater Sewer 1,260 M Pp Pipes Dn 315 340 M Pp Pipes Dn 160 370 M Stb Pipes Dn 500 30 M Stb Pipes Dn 600 44 St Stb Shafts Dn 1000 10 St Stb Shafts Dn 1200 1 St Stb Shaft Dn 1500 23 M Steel Pipe Dn 800 Pressing Through Under Railway Embankment - Dirty Water Sewer 1,400 M Pp Pipes Dn 250 340 M Pp Pipes Dn 160 43 St Stb Shafts Dn 1000 - Rain Retention Basin 1,300 Cbm Soil Removal Retention Area, Removal Up To Z3, Dk I 2,100 Sqm Sealing Membrane 1 Piece Of Prefabricated Reinforced Concrete Part With Throttle Element 280 M Rod Mesh Fence Section Road Construction Work: 1,500 Sqm Bit. Milling The Road Surface, Removing 4,800 Cbm Of Topsoil, Loading, Interim Storage, Removing 3,150 Cbm Of Topsoil, Removal Of 9,700 Cbm Of Excavated Soil, Traffic Areas, Removal Up To Bm-F1 14,000 M² Of Coarse Subsoil, 14,000 M² Of Soil Improvement, Lime/Cement, 2,200 Cbm Of Soil Material, Delivery Of 5,300 Cbm Frost Protection Layer 220 M Sewer Pipes Pp Dn 160 58 St Street Drains 300 M Concrete Curbs, High Side Form 930 M Concrete Curbs, Round Edge Form 2,415 M Concrete Curbs, Low Side Form 1,200 M Gutter Plates 9,250 Sqm Asphalt Base Layer 750 Sqm Asphalt Binder Course 2,150 Sqm Asphalt Surface Layer 510 Sqm Concrete Paving Section Water Supply: 1,620 Cbm Of Excavated Earth, Pipe Trench, Drainage To Bm-F1 1,260 M Pe-100-Rc Pipes, Da 110, Sdr 11 Incl. Fittings 90 M Pe100 Rc Pipes, Da 90, Sdr 11 Incl. Fittings 78 House Connections Pe 100 , Da 40 To Da 63, Sdr 11 800 M Protective Pipe Dn 75 Electricity And Empty Pipe Supply Section: 575 Cbm Excavated Earth Cable Trench, Drainage Up To Bm-F1 7,300 M Low-Voltage Cable, Provided On Site, Laid 1,900 M Street Lighting Cable, Provided On Site, Laid 550 Medium Voltage Cable, Provided On Site, Laid 550 M Control Cable , Provided On Site, Installed 11 St Cable Distribution Cabinets 250 M Empty Cable Pipes Dn 100
|