Structural Shell Work – Earthworks And Shell Construction Work. ##New Construction Of Brüder-Scholl-Gesamtschule Göttingen Kurt-Huber-Weg 1-5/37079 Göttingen ##The Property Is Located On The North-Western Edge Of The City Center Of Göttingen, Well Connected Via A Main Road And Federal Highway 3. The School Grounds Are Located Parallel To The Grone Water Body. The Construction Site Is Located At The Rear Of The School Grounds. The Construction Site Itself Is Accessed From Grätzelstrasse Via An Existing Path That Is Approximately 3 M Wide And Is Being Built And Used As A Construction Road. The Kurt-Huber-Weg Itself, Which Is The Addressed Street On The School Grounds, Runs As A Paved Road Across The Entire School Grounds, But May Not Be Used As A Construction Road And Access To The Construction Site. A Site Visit Is Recommended. Photo Documentation Of Property K Is Included In The Tender Documents. Parking Is Prohibited On School Grounds. Parking Is Only Possible In Public Spaces. Parking On The Property/Construction Site Is Very Limited, Loading And Unloading Is Possible. Deliveries Must Be Reported To The Construction Management 3 Days In Advance. Areas For Construction Site Equipment And Storage Facilities Must Be Coordinated With The Local Construction Supervisory Authority / The Client And Secured On Your Own Responsibility. ##The New Building Comprises Two Full Floors Above Ground With A Partial Basement That Is Completely Underground. #Usable Area: 2,184.8 M² (Without Basement) 2,247.5 M² (With Basement) Net Room Area: 2,893.5 M² (Without Basement) 3,674.5 M² (With Basement) Gross Floor Area: 4,137.59 M² Gross Volume : 16,996.11 M³ #The School Building Will Be Constructed Using Timber Panel Construction, With The Basement Being Planned Using Reinforced Concrete (Wu-Concrete). The Reinforced Concrete Cores In The Middle Zone And The Stairwells Provide Further Reinforcement For The Building. The Façade Is A Wooden Façade Consisting Of Prefabricated Elements; A Post-And-Beam Façade Is Planned In The Entrance Area. The Mixed Construction Of The New Building Is Reflected In The Interior Of The Building In The Form Of Visible Clt Ceilings And Walls And Exposed Concrete Surfaces. #The New Building Is Planned To Passive House Standard, With A Pv System And Night Cooling. ##Essential Execution Work Is: ##Earthwork: #-Prepare Construction Area 900M³ Of Soil Removal, #-Produce Construction Pit In Several Layers Approx. 5,100 M³, #-Building Rubble And Concrete Foundations Excavation Approx. 300 M³, #-Building Pit Filling Gravel Layer And Gravel Mixture Approx. 2,700 M³, #-Water Retention System (Drainage Line Approx. 90 M, Drainage Shafts Approx. 6 Pieces), Pumping Station, #-Sewer Construction Work, Pipe Trench 260M, New Lines Pe Pipes Da 160, 225 Approx. 260 M, ##Shell Construction Work #-Reinforced Concrete Work Approx. 2,000 M³ (Incl. 700 M³ Waterproof Concrete) In Sole Plates, #-Basement Exterior Walls, Interior Basement Walls, Interior Basement Supports, Interior Basement Beams, #-Strip Foundations/Coves, #-Elevator Shaft With Underpass, Feed Shaft, #-2X Pump Shafts, #- Interior Walls On Upper Floors
|